輕鐵規劃小冊子

|TransEd-Renderings Booklet|輕鐵規劃小冊子|

TransEd-RenderingsBooklet-Nov2016-v4-page-001

TransEd-RenderingsBooklet-Nov2016-v4-page-002 TransEd-RenderingsBooklet-Nov2016-v4-page-003 TransEd-RenderingsBooklet-Nov2016-v4-page-004 TransEd-RenderingsBooklet-Nov2016-v4-page-005

TransEd-RenderingsBooklet-Nov2016-v4-page-006 TransEd-RenderingsBooklet-Nov2016-v4-page-007 TransEd-RenderingsBooklet-Nov2016-v4-page-008 (1) TransEd-RenderingsBooklet-Nov2016-v4-page-017 TransEd-RenderingsBooklet-Nov2016-v4-page-018 TransEd-RenderingsBooklet-Nov2016-v4-page-019

施工進度

TransEd-ConstructionSched-Winter2016-v8 (1)-page-001 TransEd-ConstructionSched-Winter2016-v8 (1)-page-002

 

Screen Shot 2013-11-26 at 5.18.23 PM

Screen Shot 2013-11-26 at 5.18.30 PM

Project Report: http://www.edmonton.ca/city_government/urban_planning_and_design/mill-woods-station-area-plan.aspx

“This video follows the southeast portion of the route from Mill Woods Town Centre to City Centre West, shows the locations of stops and stations and provides an overall look and feel of how new tracks and low-floor trains could integrate with Edmonton neighbourhoods.

The video offers a preliminary idea of how the Southeast to West LRT could look based on the Concept Planning phase. It does not include details from the current Preliminary Design phase or future developments. It also does not reflect the results of past and ongoing consultation with the public and various community groups throughout the city. The video will be updated to incorporate valuable information resulting from public consultation when the Preliminary Design phase is completed. Preliminary design will continue through 2013.”

Source: The City of Edmonton
Link: http://www.edmonton.ca/transportation/ets/lrt_projects/mill-woods-to-city-centre-lrt-video.aspx